|
|
|
||||||||||
The LEC wind turbine test facility ( WEST Facility) is used for experimental aero-hydrodynamic studies using scaled- and full-size models. The water-towing tank has dimensions of 40×1×1m. A four-wheeled carriage, which is mounted on rails extending along the sides of tank, is driven by a DC motor and tows a model through the stationary water. A water-towing tank has several advantages over a wind tunnel. First, it can provide higher Reynolds numbers both with negligible background motion of the ambient flow and with low power consumption during operation. Secondly, a water-towing tank is well suited for the investigation of accelerating and decelerating flows, which is usually quite challenging in other types test rigs. ![]() The water-towing tank is equipped with a 6-component load cell for force and moment measurements. The aero-hydrodynamic forces and moments can thus be measured over a range of Reynolds numbers (0.5 to 150 × 104). An infrared sensor is used to measure the speed of the carriage, and by synchronization with the load cell, unsteady measurements can be made.
|
|
![]() ![]()
|
Wichtiger Hinweis:
Diese Website wird in älteren Versionen von Netscape ohne
graphische Elemente dargestellt. Die Funktionalität der
Website ist aber trotzdem gewährleistet. Wenn Sie diese
Website regelmässig benutzen, empfehlen wir Ihnen, auf
Ihrem Computer einen aktuellen Browser zu installieren. Weitere
Informationen finden Sie auf
folgender
Seite.
Important Note:
The content in this site is accessible to any browser or
Internet device, however, some graphics will display correctly
only in the newer versions of Netscape. To get the most out of
our site we suggest you upgrade to a newer browser.
More
information